Industrial park · Berezan, Kyiv region

City of Glass industrial park

An industrial site built around Ukraine’s first float glass plant. We invite manufacturers and service companies to join the park.

Aerial view of the CTIEC reference float glass plant
CTIEC reference plant of the same design as the Berezan plant

Schematic, not to scale. Tap a plot or a name to see what its teaser covers.

38.3 hapark area including reserve
10 MWgrid connection built
10,000 m³/hgas after network looping in 2027
50 kmto Kyiv, rail station nearby
18.6 million m²of glass a year from the anchor plant
10 yearscorporate income tax exemption for park participants
Park anchor

Ukraine’s first float glass plant

The plant gives the park raw material, freight flow and infrastructure. Participants build their plants next to it and trade with it on market terms.

600 t/day CTIEC technology first glass December 2028
Opportunities for participants

Six businesses the park is looking for

Three plants that use the park’s glass and three operators that serve it. Open a card to see what its teaser covers.

Manufacturing

Magnetron coating line

Energy-saving and solar-control glass on clear glass from the plant next door. All coated glass in Ukraine is imported today.

Manufacturing

Fiberglass plant

Glass-fibre rovings and composite products: rebar, panels, tanks. Part of the feedstock is the park’s glass waste.

Manufacturing

GRP pipe plant

Medium and large-diameter pipes for water supply, sewerage and stormwater networks.

Operator

Cullet management

Collect, sort and process cullet from processors and building sites for the park’s plants.

Operator

Glass transport company

A fleet of glass-carrying trucks for deliveries in Ukraine and runs to Poland and Romania.

Operator

Energy company

Cogeneration, solar with storage and power supply for park participants.

Why the City of Glass

A ready site for your plant

Raw material next door

Glass, cullet and the anchor plant’s freight flow, right over the fence.

Utilities on site

10 MW of power, gas and an on-site borehole. Roads and drainage are designed.

Industrial park incentives

A registered park: state support for infrastructure and tax incentives for participants.

Logistics

50 km to Kyiv, a railway station in Berezan, road links to the EU borders.

Land

18 ha of adjacent land for new plants, leased without auction within the park.

Support

The park’s management company helps with the plot, connections and permits.

The park in numbers

Glass, power and timing

What the anchor plant brings to its neighbours.

Glass volumes

million m² a year
Float plant output18.6
Coated glass sold in Ukraine, all imported≈7
Planned coating line capacity5

Power on site

MW
Grid connection, built10
First cogeneration project4.68
Float plant load, up to 8 at heat-up≈4
Potential demand from park residents (estimate)15

Timeline of the anchor plant

key dates
  1. Oct 2026Today: design and permits in place
  2. 2027Gas network looping to 10,000 m³/h
  3. Dec 2028First float glass
  4. Apr 2029Full output
  5. 2030First full year: 186,150 t of glass, ≈22 trucks a day
Teaser request

Get the teasers instantly

Pick the businesses that fit your plans and leave your contacts. The PDF teasers open right after you send the form.

Which teasers should we send?0 of 6
Where should we send them?

We use your details only to send the teasers and follow up on them. No newsletters.

Prefer email? ovl@city1development.com.ua
Contact

Write to us

Tell us what you plan to make, and we will suggest a plot and send the details.

ovl@city1development.com.ua

In this teaser